This is the chart electricians tape inside their gang box lid: every multiplier and shrink factor for the bend angles you will actually use, on one page. Bookmark it.
Mark spacing = obstacle height × multiplier. Total shrink = height × shrink per inch.
| Bend angle | Multiplier | Shrink per inch of height | Best for |
|---|---|---|---|
| 10° | 6.0 | 1/16" | Long runs, minimal shrink |
| 15° | 3.9 | 1/8" | Shallow, low-profile offsets |
| 22.5° | 2.6 | 3/16" | Tight quarters |
| 30° | 2.0 | 1/4" | Everyday offsets |
| 45° | 1.4 | 3/8" | Tall obstacles, short distance |
| 60° | 1.2 | 1/2" | Maximum rise, minimum run |
The multiplier is the cosecant of the bend angle — 1/sin θ. At 30°, sin 30° = 0.5, so the multiplier is exactly 2.0: a 6" obstacle needs 12" between marks, no calculator required. The numbers above are rounded to what fits on a tape measure; the calculator on this site uses the full-precision values.
| Conduit size | Take-up (deduct) |
|---|---|
| 1/2" EMT | 5" |
| 3/4" EMT | 6" |
| 1" EMT | 8" |
Take-up is a property of the bender head, not a formula — always confirm against the markings on the bender in your hands.
The chart gives you spacing and shrink in seconds. The calculator adds what the chart cannot: exact mark locations from your bender's actual radius, remaining straight lengths, minimum stick length, and a warning before a bend is physically impossible. Use the chart for quick layout, the calculator before you cut.
Try it free: Open the free conduit bending calculator — all six bend calculators, no sign-up.
Get Conduit Bend Calc on Google Play for bender calibration and Pro tools.